Completed Projects
1. Ghorashal Power Station 5th Unit
Client: Bangladesh Power Development Board
Contractor: Technopromexport ( TPE ), Russia
Customs clearance and transportation of Ghorashal Power Station cargoes from Chittagong port to plant site at Ghorashal.
2. 52.50 MW Power Plant – Kathpatti, Munshiganj
Client:
Bangladesh Power Development Board ( BPDB )
Contractor:
Sinha Peoples Energy Limited, Bangladesh – 2013
Delivered 7
(seven) Nos. of STX Engines, each 182 MT in weight along with full
specification of the power plant machinery, to the island of Kathpatti,
Munshigsnj. A channel of 1.5 Km had to be dredged to bring the barges to the
Power Plant.
3. Summit Bibiyana 450 MW Combined Cycle Power Plant
Client:
Summit Bibiyana II Power Company Limited
Contractor:
NEPC-CMEC, China – 2014
Customs clearance and transportation of 30,000 FRT
of project cargoes from Mongla/Chittagong port to Sherpur, Bibiyana. Cargo
includes 188 MT TFX among others.
4. Kodda 150 MW Dual Fuel Power Plant
Client:
BPDB-RPCL Powergen Limited
Contractor:
CCC Engineering Limited, China – 2015
Customs cleared and transported 9 x 325 MT MAN
Engines, Alternators and complete power plant equipment from Mongla and
Chittagong port to Kodda site. Had to construct a special cofferdam of 900ft x
250ft to reduce water level in the Turag river for smooth passage of the barges
under Ashulia bridge.
More details of
the project with photographs may be seen in special project section of the
website.
5. Shahjibazar 330 MW Combined Cycle Power Plant
Client:
Bangladesh Power Development Board
Contractor: Guangdong Power Engineering Corporation
Limited (GPEC), China – 2017
Customs clearance, inland transportation of entire project cargoes
comprising of heavy lifts as well as general cargoes from Chittagong and Mongla
port to Shahjibazar Power Plant site. Building of by-pass road and bridge on
the Khoai River and construction of temporary jetty at Sherpur, Moulvibazar.
6. Payra 1320 MW Thermal Power Plant
Client:
Bangladesh China Power Company (Pvt.) Limited
Contractor: NEPC, China – 2016
A Concern of:North West power Generation Co., Ltd.
and China National Machinery Import & Export Corporation (CMC). Customs
clearance and Transportation of 1st Consignment Comprising of 424
pages/1,289.293 MT/3,083.45 CBM cargoes by barge from Chittagong port to Payra
Power Plant jetty. These cargoes were received directly from the Vessel onto
the flat barges.
7. Bhola 225 MW Power Plant
Client:
Notun Biddyut (Bangladesh) Limited
Contractor: Bisho Infra,India – 2018
We constructed a heavy duty jetty on the bank of
Tetulia river to handle both heavy lifts and cranage operations during high and
low tide.
8. Mirsarai 150 MW Dual Fuel Power Plant
Client:
BR Powergen Limited
Contractor: Sinohydro Corporation Limited, China – 2019
We got the contract for clearance and transportation
of 240 units of 40′ containers from Chattogram port to Mirsarai Power Plant
project. We have started delivery of the containers very recently.
9. Sirajganj 413 MW Power Plant
Client:
Sembcorp North-Westpower Company Ltd.
Contractor: SEPCO III Electric Power Construction
Corporation,China. 2017 – 2019
The temporary landing jetty was constructed by Avant
logistics Ltd. at Sirajganj for receiving 3 Heavy Lift cargos and General
cargos for the construction of 413 MW Dual Fuel CCPP. The Heavy Lifts were
GT-410 Ton, GTG-330 Ton and TFX- 210 Ton.
More details of
the project with photographs may be seen in special project section of the
website.
10. Ruppur 2,400 MW Nuclear Power Plant
Client:
Bangladesh Atomic Energy Commission
Contractor:
Atomstroyexport, Russia. 2017 – ongoing
Avant logistics Ltd. started delivering cargoes to
Ruppur Nuclear Power Plant (RNPP) from the beginning of 2018. Till now Avant has
delivered over 40,000 FRT of cargoes through Chattogram port, Mongla port and
Dhaka Airport. The highest load of a single piece so far was 465 Ton (Stator). Avant
delivered two such Stators. We used specially constructed barges, jetties and
super cranes for unloading of the heavy lift cargoes and used 24 lines of SPMT
for transportations of these heavy lifts. Avant plans to handle more specially
designed cargoes comprising of heavy lifts, ODC and general cargoes for RNPP
project in coming days. Avant has worked for ORGANOGOSTROY in the earlier days
and now working for other major sub-contractors of ATOMSTROYEXPORT (ASE) at
RNPP project.
11. Summit Meghnaghat 583 MW Power Plant - Phase II
Client:
Summit Meghnaghat Power Company Limited
Contractor: General Electric (GE), USA &
NEPC,China. 2019 – 2022
Customs clearance and transportation of full
specifications (70,000 FRT or more) of this project, which includes twenty
three units of Heavy Lifts consisting of Gas Turbines (378 MT), Generators (307
MT) & Transformers (320 MT) as well as Break-bulk, General Cargoes and
Containers for the entire project. All HRSG Modules and 378 MT Gas Turbine and
292 MT Generator were delivered to Meghnaghat site. 35,000 FRT cargoes are yet
to arrive.
12. Ghorashal Polash Urea Fertilizer Factory (GPUFF)
Client: Bangladesh
Chemical Industries Corporation
Contractor:
Mitsubishi heavy Industries Limited, Japan. 2021 – 2023
Avant Logistics
Ltd. signed a contract with COSCO Shipping Project Logistics, China for the
construction of a specially designed jetty at Ghorashal for unloading the
entire project materials (600,000 FRT approx.) comprising of super heavy lifts,
ODCs and general cargoes to be imported for this project. Designed by Avant,
the construction started in February 2021 and was completed in July, 2021.The
Jetty had two parts – one crane jetty (dim 40.55m X 16.7m X 25.1m) and the
other one is Ro-Ro jetty (dim 17.2m X 83m). Avant obtained license from BIWTA
for construction and maintenance of the jetty for 2021-2023, as per the
requirement of COSCO. Cargoes started arriving from May 2021. Avant also signed
a contract for customs clearance, transportation for the above cargoes from
Chattogram port, Mongla port and Dhaka airport.
13. Rohanpur 400/132 KV interim Sub-station
Client:
Power Grid Company of Bangladesh (PGCB)
Contractor: Reverie Power & Automation Engineering
Limited, Bangladesh – 2022, 2023
Avant logistics Ltd. signed a contract with Reverie Power
& Automation Engineering Ltd. for delivery of 3(three) nos Transformers
(TFX) each weighing 322 MT to be delivered to Rohanpur, Chapainawabganj. The
first TFX was delivered in March,2022 and Two others were delivered during
February – March,2023. It was an extremely challenging job involving
construction of jetty at Mukterpur, Rajshahi on the bank of Padma River and
barging from Mongla to Mukterpur in dry season. The TFXs were then transferred
from barges to Multi Modulus Axles (HMT). We used 14 lines of HMT to transport
the TFXs through 110 km road where some part of road was under construction and
we had to widen about 10km of road for easy maneuvering of the long vehicle. We
delivered all TFXs safely and placed them of the foundations including
alignments.
14. Sreepur 150 +/- 10 PCT ( HFO Based) Power Plant
Client: B-R Powergen Limited
Contractor: MAX Infrastructure Limited, Bangladesh – 2023
Avant Logistics received 9 (nine) sets of power plant equipment
each consisting of MAN Engines, each 325 MT (dim 13.0m×4.9m×6.5m), Alternators,
each 62 MT (dim 4.68m×5.5m×5.5m) and Turbo Chargers, each 32 MT (dim 5.2m×3.6m×3.6m)
at Mongla port in one single shipment, for MAX Infrastructure Limited. After
Customs and port clearance, all 27 pcs were loaded onto 11 (eleven) flat top
barges. The barges were chosen very carefully with strong deck but low draft as
we had to negotiate narrow river after Ghorashal in the months of Feb-March. We
constructed a three step jetty at Sreepur on the bank of Sitalakhya river and
transferred all cargoes to the jetty for onward delivery to respective
foundations, about 700m far we also did placement and alignment of all cargoes.
For this job we used the following equipment and manpower:
Flat top
barges
– 11 nos
Hydraulic
winches –
2000 ton x 1
– 800 ton x 2
Cranes
– 230 ton x 1
– 170 ton x 1
Low bed
trailers –
150 ton x 3
Manpower
–
150 people
The project was completed successfully and on times. Avant
Logistics Ltd received special bonus for this project from the client, Max
Infrastructure Limited.
15. Dismantling, removal, towing and loading onto Semi-submersible vessel of Power Barges TIGER-I & TIGER-III for export
Client: Khulna
Power Company Limited (KPCL)
Contractor: Avant
Logistics Limited, Bangladesh – 2022
Avant Logistics Ltd. undertook a different kind of job in
2022 involving export of two Power Barges named TIGER-I and TIGER-III of Khulna
Power Company Ltd. (KPCL), moored inside a basin at Khalishpur, Khulna. Each
power barge had an individual dimension of 91.44m X 24.4m X 5.5m, weighing 4100
Ton and had a power output capacity of 55 MW each. We removed all onshore power
plant installations and loaded them into the two power barges. There were 19
chimneys (stacks) of 26.44 m height on top of the barges and we had to cut down
16.88 m to adjust the height clearance of Rupsha bridge. We loaded 10 (ten)
chimneys inside TIGER-I and 9 (nine) chimneys inside TIGER-III. The Power
barges were removed from the basin at the power plant and towed by 3 (three)
tugs to maneuver through Bhairab, Rupsha and Poshur rivers during full rainy
season of June and July to reach Akram point (about 60km from Mongla port) and
to load them onto Semi-submersible vessel HUA XING LONG. This was a very
challenging operation done safely and professionally. The following major
equipment were used for the job:
1.
3200 HP Tug boat x
2
2.
2400 HP Tug boat x
1
3.
1600 HP Tug boat x
1
And other requirement and manpower. After removal the
adjacent river bank and boundary wall of the power plant were replaced to their
original conditions.
More details of the project with photographs may be seen in
special project section of the website.
16. Site Development and Construction of Well no. Haripur-10 at Sylhet Gas Field, Sylhet, Bangladesh, included Engineering, Supply of material, Equipment, Manpower and Construction etc. on Turn key Basis.
Client: Sylhet Gas
Fields Limited (SGFL)
Contractor:
SINOPEC International Petroleum Service Corporation, China. 2022 – 2023
Avant logistics Ltd undertook yet another different kind of
project to expand their horizon of activities. This time under Sylhet Gas
Fields Ltd (SGFL), Avant developed their Haripur-10 Gas Field, under contract
of SINOPEC, a major Chinese Gas Drilling Company. Avant developed an area of
approx. 5 (five) acres of land with an access road of 500m with 25m width. The
total area was developed from a very low-lying area and Avant raised the whole
area about 3.5m. Avant designed and constructed full drilling facilities
including the following:
·
Land Development
of about 90,000 Cubic meter area.
·
Construction of
HBB including Box Cutting and Leveling of 13,000 sq. m area.
·
Construction of
Drilling Rig, machinery foundation including, Mud Tank, Mud Pit, Drilling Rig,
Generator foundation etc.
·
Construction of 2
(two) Deep Tube wells with Pump Houses
·
Construction of 2
(two) Culverts
·
Drainage System
(both Internal and Peripheral) of 1,850m
The job was
finished with full Satisfaction of the Client and considered as the best
drilling site of SGFL.
Other Projects
- Rampal 1320 MW Coal Power Plant.
- Khulna Mongla Rail Line Project.
- Seismic Survey under BGP Inc., China National Petroleum Corporation
- Various sub-station of CCCE, under PGCB and DPDC